| FEATURE |
FUNCTION |
BENEFIT |
| Extruded virgin rubber |
Absorbs destructive energy from
both rail deflection and vehicular traffic.
Extends expected crossing life. |
| • |
Maintains integrity of rail fastening system. |
| • |
Reduces overall maintenance costs. |
| • |
Reduces traffic disruptions (both for rail and
road traffic) and allows optimal train speeds through
the life cycle. |
|
Interface profile matches
exact contours of rail |
Seals out surface water and foreign elements. |
| • |
Reduces fouled and contaminated ballast,
maximizing structural support. |
| • |
Life cycle of rail fastening system is greatly
improved |
|
| Flexible flangeway |
Allows train and vehicular traffic to break up
dirt and ice. |
| • |
Prohibits compaction of flangeway contaminants,
greatly reducing the threat of derailments. |
| • |
Provides a maintenance free interface for both
railroads and road authorities. No costly flangeway
leaning or signal problems. |
|
| Guaranteed reusable |
At least two crossing rehabilitation’s from
every foot of Epflex Railseal. |
| • |
Lower cost per year when amortized over
life of product. |
|
| Installation supervision |
Skilled personnel available to train your crews. |
| • |
Speeds installation and greatly reduces
installation costs. |
|
| Compression clip for joining lengths |
Keeps surface water draining out of crossing. |
| • |
Keep joints under tension. Tight fit directs
water to drainage ditches. |
|
| Designed to maximize load support from adjoining
materials |
Evenly distributes load bearing between the rubber,
asphalt and rail. |
| • |
Maximizes load support of rail and asphalt
while allowing sufficient isolation to absorb destructive
energies. |
|
| Flexible support diaphragm design |
Maximizes support from ballast between ties. |
| • |
Load bearing is uniform through the length
of the crossing. (On the ties and between) |
| • |
Epflex Railseal is held tight to the rail during installation
to insure proper orientation of finished crossing. |
|
| Optimal surface groove design |
Absorbs initial impact through localized deformation. |
| • |
Amount of impact stress transferred to the
rail and fastening system is greatly reduced. |
| • |
Rebounds quickly to keep Epflex at grade. |
|
| Eplock II installation clips |
Maximum holding force, easily and uniformly applied,
every time. |
| • |
Optimal job with little or no supervision. |
| • |
Clamping force insures destructive forces are not transferred
to the asphalt blanket. |
|
| Stackable packaging |
Product stored straight, neat and safe. |
| • |
No preset distortion from "piled" rubber. |
| • |
Minimal space required. |
| • |
Easily transloaded to job site. |
|
| ISO 9001 Registered |
Complete quality system through all phases of
production and design. |
| • |
Customer confidence that every need will
be met or exceeded, every time. |
| • |
Quality ensures on time delivery, usually from inventory. |
|
Epflex Railseal Interface and Eplock II have helped
hundreds of railroads and road authorities stretch their
maintenance budgets. For more information on how Epflex Railseal
can be your flexible Interface between
lower budgets and rising costs, call our action team at 1-800-265-2710 |